Product Introduction
Present your sushi and sashimi in perfect condition. The SU series sushi showcases combine refrigerated display with elegant glass presentation — customers see the full selection while food stays at a safe +2 to +8°C. Available in 1.2m (450W), 1.5m (500W) and 1.8m (600W) lengths, each with fan-assisted cooling, premium Danfoss compressors and a left-side cooling system that keeps the display area unobstructed. Ideal for sushi bars, supermarkets, hotels and Japanese restaurants. CE-certified. Request a quote today.
Model Specifications
Specification |
SU1.2L |
SU1.5L |
SU1.8L |
Dimensions (W×D×H) |
1200×376×385mm |
1500×376×385mm |
1800×376×385mm |
Power |
450W |
500W |
600W |
Voltage / Frequency |
220-240V~50/60Hz |
220-240V~50/60Hz |
220-240V~50/60Hz |
Compressor |
Danfoss |
Danfoss |
Danfoss |
Temperature Range |
+2°C ~ +8°C |
+2°C ~ +8°C |
+2°C ~ +8°C |
Cooling Type |
Fan Cooling |
Fan Cooling |
Fan Cooling |
Thermostat |
Digital |
Digital |
Digital |
Cooling Position |
Left side |
Left side |
Left side |
Material |
304 Stainless Steel + glass |
304 Stainless Steel + glass |
304 Stainless Steel + glass |
Product Features
 |
1. Premium Materials & Seamless Craftsmanship
- Selected 304# / 201# brushed stainless steel, fully welded, polished and re-brushed to prevent water leakage and mold
- Flawless surface with no uneven reflections from 1 meter away
-
Tempered glass sneeze guard keeps condiments protected and displayed
|
|
2. Efficient Cooling & Anti-Corrosion
- Imported compressor adapts to different global voltages — prevents damage from unstable power
- Threaded copper tubes maximize cooling, coated with anti-corrosion layer to resist strong acid and alkali
- Precise fan-assisted air cooling ensures even temperature distribution (0.5-1°C variance)
-
Auto-defrost system — condensation evaporates automatically, no floor drain needed
|
|
3. Superior Insulation & Foaming
- High-density (42g/cm³) Cyclopentane foaming with 50mm thick insulation layer — locks in cold, saves energy
-
Thermal break: 38mm PVC strip blocks heat transfer and reduces dust & residue buildup
|
|
4. Smart Details & Easy Maintenance
- Digital thermostat for precise temperature management and easy operation
- Tool-free magnetic door seals; removable plastic door frame makes replacing the heating wire easy
- Heavy-duty shelves, each holds up to 30kg; raised inner bottom edges prevent water entering the foam
-
Optional security locks to protect valuable ingredients
|
 |
5. Certifications & Delivery
- CE & RoHS certified
- 15-30 days lead time; T/T, L/C, Credit Card & PayPal, Western Union accepted
-
Custom OEM/ODM options available
|
Project Cases
- Installed in 500+ kitchens across 80+ countries worldwide
- Salad bars, sandwich shops, delis, hotels and catering operations
- Free layout & specification design for project customers


Q1: Are you a direct factory or a trading company?
A: We are a comprehensive commercial kitchen engineering contractor. We operate our own manufacturing facilities (specializing in custom stainless steel and heating equipment) AND serve as an authorized distributor for 40+ top international brands. This allows us to provide unbiased, optimized, and tailored equipment combinations for your project.
Q2: What is exactly included in your "A-Z Turnkey Solution"?
A: We handle everything from the ground up. You provide the floor plan, and we deliver a fully operational kitchen. Our services include:
l 2D/3D kitchen layout design & MEP consulting
l Custom manufacturing & equipment procurement
l Global logistics & online/onsite installation guidance
Q3: How do you guarantee the quality of international projects?
A: Quality is our baseline. Our self-manufactured equipment utilizes world-class components (e.g., German thermostats, imported IGBT modules). Furthermore, every single piece of equipment—whether built by us or sourced—undergoes a rigorous unified pre-shipment inspection by our engineering QA team before container loading.
Q4: What is the typical lead time for a complete kitchen project?
A: For a complete A-Z project, the production and consolidation timeline typically ranges from 4 to 6 weeks after the final layout and equipment list are approved. We provide strict project timelines to ensure your facility opens on schedule.
Q5: How do you handle warranty and after-sales service overseas?
A: We provide a 1-year warranty on core components. Understanding the distance, we proactively include a package of essential vulnerable spare parts with your initial shipment. Additionally, our technical support team offers 24/7 online troubleshooting and video guidance to ensure zero downtime.